
E-100 Epoxy 100%
Faster Setting 100% Solids Epoxy
Quick Facts: E-100 Epoxy
Solids Content (weight) – 100%
Dry Time, Tack Free – 6 to 8 hours
Dry Time, Foot Traffic – 14 to 18 hours
Dry Time, Heavy Traffic – 2 to 7 days
Recoat Window – 10 to 16 hours
Pot Life @ 72⁰ F – 10 – 15 Minutes
Application Temperature:
Substrate – 50° to 80° F
VOC – less than 50 g/L
Packaging:
¾-Gallon Kits
3-Gallon Kits
15-Gallon Kits
COVERAGE
Typical coverages are as follows for E-100:
As a Primer or Receive Coat: 160 sq ft per gallon for 10 mil DFT
As a Build Coat: 100 sq ft per gallon for 16 mil DFT
TYPICAL USES of E-100 Epoxy:
Versatile Epoxy that can be used in Industrial, Commercial, and Residential applications such as:
Schools and Universities
Residential Garages and Basements
Manufacturing and Warehouse Floors
Retail, Restaurants, and Hospitality
Healthcare and Medical Offices
PRODUCT ADVANTAGES of E-100 Epoxy
Versatile Self-Leveling Formula
10-15 Minute Pot Life at 72° F
Faster Set Time for Quick Turnaround
Can add E-FAST to Reduce Working and Set Times by 50%
Tint in the Field with Pigment Packs
Low Odor and VOC Compliant
MIXING INSTRUCTIONS
If less than full kits will be mixed, each component should be mixed thoroughly with individual tools. Using the same tool to mix part A and Part B will cause contamination and ruin the material being saved for future use. E-100 is to be mixed at a ratio of 2 parts A to 1 part B. In clean mixing containers pour the correct ratio in and mechanically mix for 3 minutes using a jiffy-style mixer. DO NOT USE A STIR STICK! The amount of material mixed should only be what can be utilized within the listed pot life of the product. If mixing full 0.75-gallon or 3-gallon kits, the Part A pail may be used as the mixing container.
APPLICATION INSTRUCTIONS
Do not leave mixed material in the mixing container. Mixed product should be poured onto the floor in ribbons then spread and backrolled. A flat or notched squeegee is the most efficient method to quickly get the material across the floor. Do not over-work the product.
RECOAT: Recoat time listed above is directly affected by the ambient surface temperature. Apply additional coatings as early in the recoat window as possible for the best results. Even within the recoat window it is recommended to abrade and clean the existing coat. If the recoat window has passed, it is critical to thoroughly abrade the surface with 80 to 120 grit sanding screens. Thoroughly clean the existing coating before abrading to remove potential contaminants.